Assembly 

 

General advice 

The rope netting has been knotting by a hercules rope (an steel wire rope, which is coated with chemical 
fibre). This coating could become damaged, if you move the rope over the ground. Please work carefully.     
 

Spread out rope netting 

The rope netting has been folded up following knotting in the factory. Take the netting out of the container 
in accordance with the folds. The netting should be spread out in a triangular shape with the base of the 
triangle  lying  in  the  diagonals  of  the  foundations.  The  tip  of  the  netting  can  be  recognised  by  the 
aluminium  mast  cap  and  should  be  lined  up  with 

foundation  3

 

(see  schematic  diagram)

.  The 

connection  with 

foundations  1

  and 

2

  should  now  be  created,  using  the  tension  jacks  to  connect  the 

netting to the tension rods of the foundations. 

 

Insert the mast into the netting 

Push the mast through the netting to the tip of the net. A hemp rope is attached to the netting as a guide 
when threading though. Once the mast has been threaded through, place the mast cap in the mast, raise 
the mast slightly by lifting it and support it temporarily on the tip. In this position, it should be ensured that 
the mast supports itself on the round plate of the mast plate.  

 

Raising the mast 

When raising the mast it is essential to ensure that you pull the mast, not the net. To raise the mast, use a 
cable pull (10 KN tensile force). The mast, including the netting, should be raised carefully. In particular, it 
should  be  ensured  that  the  mast  plate  is  in  the  mast  tube  and  is  not  pulled  out  and  that  the  foot  of  the 
mast  is  pulled  onto  the  round  plate.  Once  the  mast  has  been  raised  higher  than  45°,  the  connection 
between the netting and foundation 3 is created. The mast should be raised higher until it is in a vertical 
position. The final connection with foundation 4 is now created. Pulling the netting to the tension rods is 
made easier with the aid of a crowbar, which should be placed in the curved clevis, as a result of the lever 
action. 

Do not pull the mast with the  cable pull over and above the vertical in the direction of the 

tension rods (see figure 3). 

  

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 

Summary of Contents for Ben Nevis

Page 1: ...round in the play area please refer to EN 1176 1 According to this sand wood chips gravel and HIC tested synthetic protective surfaces are permitted We recommend a covering of gravel at least 400 mm thick grain size 2 8 mm or sand grain size 0 2 2 mm If you use a synthetic protective surfaces it must be sure that all relevant parts for the maintenance see maintenance instruction on page 5 and 6 ar...

Page 2: ... foundation Anchorage B Mast plate Mast foundation Position of the eye bolts and the mast plate Minimum concrete quality for the foundations C20 25 B25 Setting time at least 8 days Amount of concrete required approx 5 8 m We assume that the foundation soil is organic soil Otherwise advice should be taken on possibly altering the size of the foundations All measurements in mm ...

Page 3: ...ng to the tip of the net A hemp rope is attached to the netting as a guide when threading though Once the mast has been threaded through place the mast cap in the mast raise the mast slightly by lifting it and support it temporarily on the tip In this position it should be ensured that the mast supports itself on the round plate of the mast plate Raising the mast When raising the mast it is essent...

Page 4: ...ting at each turnbuckle in each case a short piece must become strained till the final initial tension is achieved Ensure that the mast is in a vertical position Apply noticeable preliminary tension to the rope netting After tensioning the lock nut should be securely tightened Finally the safety ropes should be connected to the safety anchor loop via the clevises The first re tensioning of the spa...

Page 5: ...he mast cap it should be checked that the central markings on the mast rope are between the rope shackles All the anchoring cables should be checked The lock nuts should be tightened securely to the tension jacks The safety ropes should be connected to the thinner traction anchor loop via the clevis connection Check the preliminary tension of the Space Net and adjust tension if necessary Adjusting...

Page 6: ...t plate is positioned stably on the foundation and check for signs of corrosion Check the foundations for possible cracks in the concrete To do this the foundations should be exposed in the area of the tensioning anchors Please note The swaying of the mast tube is a static necessity and is therefore intentional In order to guarantee enjoyment when playing and a long life the rope Space Net should ...