background image

 

 

ROOF  ASSEMBLY 

11 

SIDE 

WALL 

FRONT WALL 

BACK WALL 

SIDE 

WALL 

TOP PLATE 

BOTTOM PLATE 

SELECT: 

 

5 x 1.720 Roof Sheets 

1 x 2.550 Spouting 

2 x 1.720 Barges 

32 x 40mm Weatherseal Nails 

28 x Rivets 

STEP 1: 

 

 

Ensure Shed is sitting level and square. 

 

 

Lay Roof Sheets on the Top Plates (with slots at front). 

 

 

Rivet sheets together at overlaps with 2 x rivets per join

.

 

STEP 2: 

 

 

Position the Roof Sheets with front overhang of 130mm at 
each end (

fig. 1

). 

 

 

Using 4 x 40mm weatherseals, nail the Roof Sheets to the 
Top Plates at each corner, ensuring ribs on the Roof Sheets 
line up with ribs on the Wall Sheets (

fig.2

).

 

STEP 3:

 

 

 

Ensure the Front and Back Top Plates are straight. Nail the 
roof sheets to the front & back Top Plates, using 1 x nail per 
pan (

fig.2

). 

11 

STEP 4: 

 

 

 

Place Barge Flashings on roof at end of shed ensuring the 
diagonal trimmed end is at the front. 

 

 

Rivet the Barge Flashings to the roof and the side wall, us-
ing four rivets on top of barge and four into the side (

fig.3

).

 

fig.2 

fig.3 

X 4 

X 4 

Barge

 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 

ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides.  
The Clear Roof Panel must be secured to the front and back 
Top Plates. Pre drill and fasten with the 40mm weatherseal 
nails provided.

.

 

fig.1 

130mm 

130mm 

STEP 5:

 

 

 

Place spouting in position and rivet to Barge Flashings at 
each end and rivet to roof sheets (1 rivet per 1 sheet). 

Summary of Contents for SS2515

Page 1: ...ASSEMBLY INSTRUCTIONS SS2515 BASE SIZE 2 520m x 1 520m...

Page 2: ......

Page 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Page 4: ...720 m 5 Barge 1 720 m 2 Door 3 4 Sheet 1 850 m 2 Padbolt Support 0 140 m 1 TIMBER Spouting 2 550 m 1 Bottom Plates H4 Green Front Back 2 520 m 2 Bottom Plates H4 Green Sides 1 520 m 2 HARDWARE Top Pla...

Page 5: ...Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Sheets Door Side Flashing Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...fig 1 Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings...

Page 8: ...ing each side of wall sheets overhangs the end of Bottom Plate by 15mm Check that the distance between the Top and Bottom Plates is correct As per diagram in step 1 Check that the Bottom Plate is stra...

Page 9: ...te using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...re the door closes properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the...

Page 11: ...support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the cor...

Page 12: ...the Front and Back Top Plates are straight Nail the roof sheets to the front back Top Plates using 1 x nail per pan fig 2 11 STEP 4 Place Barge Flashings on roof at end of shed ensuring the diagonal t...

Page 13: ...o the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75m...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: