Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smart store shed will not rust within 20 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

• 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

• 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

• 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

• 

Fastenings and fixings.

 

• 

Normal wear and tear, damage by impact or acts of God.

 

• 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

• 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group.

 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Summary of Contents for SM2515

Page 1: ...ASSEMBLY INSTRUCTIONS SM2515 BASE SIZE 2 520m x 1 520m...

Page 2: ......

Page 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...l 1 980m 3 Back Wall 1 890m 5 Side Wall Angle 1 965m 2 Side Wall Angle 1 935m 2 Side Wall Angle 1 905m 2 Roof 1 720m 5 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 2 Door Brace 1 20...

Page 5: ...ACK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 520 m 2 Front Back Top Plate H1 Red 2 520 m 2 Side Wall Bottom Plates H4 Green 1 520 m 2 Side Wall Top Plates H1 Red 1 522...

Page 6: ...ION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall S...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...m flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces...

Page 9: ...with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the t...

Page 10: ...ts to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Check that...

Page 11: ...e Plates are the correct distance apart and that the sides of the wall sheet overhang the Bottom Plate by 15mm Drill rivet Door Jamb Flashings to wall sheets using four riv ets equally spaced on each...

Page 12: ...Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring...

Page 13: ...ribs on the Roof Sheets line up with ribs on the Wall Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw...

Page 14: ...EMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: