![Smartgen HAT552 User Manual Download Page 14](http://html.mh-extra.com/html/smartgen/hat552/hat552_user-manual_1297486014.webp)
HAT552/HAT553 DUAL POWER ATS CONTROLLER USER MANUAL
HAT552/HAT553 ATS Controller 2020-05-14 Version 1.1 Page 14 of 35
8 GENSET START/STOP OPERATIONS
8.1
MANUAL START/STOP
8.1.1
PANEL START/STOP
In main screen, press Set/Confirm key to enter main menu interface; select "5. Test Genset" to enter
manual start operation screen.
When system type is "A Mains B Gen, A Gen B Mains, A Mains B Mains", the below operation interface
is directly entered.
Test Genset
Press Down key to select different parameter line (backlit) and press
Confirm key to confirm.
Return
Genset Stop
Genset Start
Genset Stop: Disconnect the outputted genset start signal, which is to control genset stop;
Genset Start: Control genset start signal output, which is to control genset start;
8.1.2
REMOTE COMMUNICATION START/STOP
Through RS485 port and by using Modbus protocol control, remote start or remote stop commands can
be issued.
Remote Stop: Disconnect the outputted genset start signal, which is to control genset stop;
Remote Start: Control genset start signal output, which is to control genset start;
8.2
AUTO START/STOP
8.2.1
START REQUIREMENTS
8.2.1.1 INPUT PORT START
Set "Remote Start Onload" or "Remote Start Offload" for configurable input ports, and they are cannot be
set at the same time.
Remote Start Onload: Genset start outputs, when generating is Ok, GB closes; when it is inactive,
disconnect genset start output signal;
Remote Start Offload: Genset start outputs, when mains is Ok, MB closes; when it is inactive, disconnect
genset start output signal;
8.2.1.2 MAINS ABNORMAL START
When Mains is abnormal, genset start outputs; when generating is Ok, GB closes;
8.2.2
SCHEDULED START
When Scheduled Gen Start is enabled, user can set scheduled start time; Controller will issue start
signal when the time is up; when the scheduled start delay time is over start signal is disconnected.
Scheduled start can be set to onload or offload.
Scheduled Start Onload: genset start outputs, when generating is Ok, GB closes;
Scheduled Start Offload: genset start outputs, when Mains is Ok, MB closes;
Scheduled Start Cyclical Time can be set to Start Monthly/Weekly/Daily.
Start Monthly: Which month to start, start date and time can be set;
Start Weekly: Start at the same time of several days in a week can be set; for example, from Monday to
Friday start at 8:00 every day and last for 10 hours.
Start Daily: Start at the same time for each day can be set.