Trueshopping
Assembly
2.1 The requirement of installing ground
Equal ground is very necessary to the machine. The ground must have a good ventilation system, and
can’t be exposed in dust, dirt, wet and active steam. The minimum distance between back board and its
nearest bar should be ≥46cm.
2.2 Check, discharge and placed
(1) After receiving the equipment, you should check if the equipment has been damaged during delivery. If
damaged, you should notify the courier, if parts are missing, please notify customer services at once.
(2) Take the spare parts out from packing box, remove the packing material, and check for any cast in
packing box.
(3) Check every airway in the shell, and make sure packing box cannot block air circulating.
(4) Choose roomy ground to place spare parts in order to install conveniently.
2.3 Installing
Connect frame of welding machine as diagram 2-1
Diagram 2-1
2.3.1 Installing the kickstand
Lock the plastic kickstand into slot on the front of chassis of machine and use tapping screws to secure.
2.3.2 Fixing the face shield (diagram 2-7)
Diagram 2-7
www.trueshopping.co.uk
6