SMART MAX GEOSYSTEMS CO.,LTD
www.smartmaxgeosystems.com [email protected]
26
9. Check & Adjustment
9.1 Check & Adjustment of Plate Vial
Check
①
Rotate the instrument horizontally by loosening the Horizontal
Clamp Screw and place the plate vial parallel with the line
connecting leveling screw A and B, and then bring the bubble to
the center of the plate vial by turning the leveling screws A and B.
②
Rotate the instrument 180°
(
200g
)
around its vertical axis.
Observe the bubble of plate vial. Fellow the steps below to adjust
it if the bubble is not in the center.
Remarks: SET-5
、
SET-6
、
SET-7
、
SET-8
、
SET-9means year,month,day,hour,minute(This is
optional )