Instruction of installation
Location
■
Please, Install the boiler in the exclusive place. (Forced Exhaust type FE)
ㆍ
The exclusive place where is keep with air supply and exhaust should be install.
Forced draught balanced flue type (FF type) should be install exclusive place only except
following case
①
and
②
①
Screw type and flange type (Connection between water heater and ventilating shaft);
ventilating shaft should not separated from water heater.
②
A ventilating opening should be connected to outside air and its size has to attain certain space.
Ventilating opening size to floor area should be in a ratio of 300
㎤
to 1
㎡
If you attach a wire net in ventilating opening, minus the wire net size.
■
Do not install at outdoors
ㆍBoiler
is for indoor use, if it is for outdoors, keep a
protection of products, especially enforce to keeping a pipe
warm prevent from winter snowing.
■
Do not install the place is sealed
ㆍ
Do not installation the place is sealed, bathroom, it could be
choked with lack of oxygen because of bad ventilation
■
Do not install near the heat appliance.
ㆍ
Take a distance 1,000mm over the other heat appliance,
Avoid the hot air.
ㆍ
Take a distance 300mm over the power outlet.
■
Caution of combustible materials
ㆍ
Do not put any combustiable material, near by boiler.
(gasoline, thinner, sulfer, match. etc)
■
Installation to the inflammable wall.
ㆍ
Take a distance of 45mm if there is inflammable wall.(both side)
ㆍ
When you install on a combustible wall, insert non-metallic
insulation panel which thickness is at least 3mm and keep at
least 150mm away from the wall on the left, right and above.
■
Ensure the distance for repairing & maintenance
ㆍ
Keep away boiler from the front wall more than 600mm in
order to for repairing or maintenance.
■
Installation on wall
ㆍ
It is prefer to hard concrete wall. If it was installed on brick or
weak concrete wall, It would be reason for noisy when boiler using.
ㆍ
The strength of wall on which boiler is installed should
be enough to support about 16~20kg weight. Otherwise,
reinforcement work is required.
ㆍ
Tighten 4fixing screw (Anchor bolt) into each 2 long holes on
upper and lower parts of the product; Take a vertical installation
to endure the weight of product.
Warning
Prohibitive
Caution for installation
17