![SMARDY HOME 190 Instruction Manual Download Page 5](http://html.mh-extra.com/html/smardy/home-190/home-190_instruction-manual_1294977005.webp)
5. Installation
The scope of supply contains a universal adapter. You can screw it directly onto your
water tap. In addition you remove the aerator (sieve) from your water tap and then
screw the thread adapter onto the water tap. Then screw the universal adapter onto
the thread adapter. Remove the nut from the universal adapter and put it over the
hose. Now screw the nut with the hose back onto the universal adapter.
With the black lever you can choose, whether the tap water should flow directly to
the osmosis system (position = lever upwards) or run as normal tap water (position =
lever downwards) through the universal adapter.
Water Inlet
Determine the assembly site for the waste water clamp. This one must absolutely be
positioned
over
the syphon bend. (the area is marked here in green)
•
Drill a hole in the syphon with a 6mm drill bit.
•
Stick the foam seal around the drilled hole.
•
Fasten the clamp (tighten both screws uniformly).
•
Cut approx. 50cm off the thin hose.
•
Put the nut over the hose.
•
Push the hose into the opening of the clamp.
•
Screw the nut and the clamp together.
•
Connect the hose with the wastewater connection ❸
2. Screw in the thread adapter
1. Remove sieve
3. Screw on the universal adapter