FRI303 – Operation and Maintenance, Instruction Manual
4.2
Assembly Procedure
Refer to figure 4.1 –
FRI303
Exploded View.
•
Place the input boards into housing (
11
), ensuring all interconnecting pins are connected;
•
Place the display (
3
) into the housing, mounting it properly according to the desired viewing
position;
•
Tighten the fixing screws (
3
);
•
Fit the cover (
1
and
10
) and lock it using the locking screws (
5
).
Firmware Update Procedure
For firmware update of the
FRI303
equipment see
FDI302-1
manual, visit website Smar:
www.smar.com
Accessories
Main and I/O boards can be changed independently.
ACCESSORIES
ORDERING CODE
DESCRIPTION
PBI-PLUS
USB Interface for Profibus PA.
SYSCON
System Configuration Tool.
PS302
Power Supply.
BT302
Terminator.
FDI302-1
Fieldbus/PROFIBUS-PA Communication Interface for Firmware
Update.
DF47
Intrinsic Safety Barrier for Fieldbus.
Summary of Contents for FRI303
Page 1: ......
Page 2: ......
Page 16: ...FRI303 Operation and Maintenance Instruction Manual 1 10 ...
Page 34: ...FRI303 Operation and Maintenance Instruction Manual 5 4 ...