
14
2721
15
2021
-
SEP60
For
Stern Thruster
installation please refer to the supplied manual in your Sleipner product delivery
Stern Thruster
SLEIPNER AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
DOCUMENT ID:
REVISION:
DATE:
LANGUAGE:
Installation Guide
Stern Tunnel Installation
MC_0003
MG_0027
Tunnel
centre line
Boats
centre line
Bow
Stern
1
STARBOARD
B
OW
Tunnel
centre line
Boats
centre line
B
ØC
ØA
Measurement
Description
mm
inch
ØA
30
1.18
B
23
0.91
ØC
9
0.35
SE
*P*IP
50
SE
*P*IP
60
B
OW
B
OW
Place top motor
bracket and bolt plate
Measure the drive
shaft has come
through the motor
bracket at the correct
height with the
template supplied.
Gasket
Ensure propeller
turns without
obstruction
Motor bracket
Bolt plate
5
BOW
BOW
Apply MS Polymer
sealant or equal to
both sides of the
gasket
Motor bracket
IMPORTANT
Do not apply sealant to
the holes.
6 - 7
2 - 4
8
Fasten bolts
18Nm (13.28 lb/ft)
*P- Propositional
*IP- Ignition Protected