20
6367
7
2021
-
SE170
Control Panel Cable Installation
•
All Sleipner control panels can be used in any combination.
•
All control panels can be installed using:
• Y-connectors - for standard on/off
• T-connectors - for S-Link proportional power system.
(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until
it receives a single signal or thrust in one direction.)
•
Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.
See the Control panel manual for more information.
MC_0041
!
Please refer to the graphic for special considerations relating to your model
!
MG_0036
Technical Wiring Diagram
M
Th
er
m
al
sw
itc
h
El
ec
tr
oni
c
interf
ac
e
bo
x
6
1232
i
A2
A1
4
pi
n
AM
P
con
nect
or
On
M
ot
or
4
2
1
3
Fu
se
Ba
tt
er
y
m
ai
n
sw
itc
h
1
5
4
2
6
8
9
re
d
(+
)
gr
ey
(s
ig
+
)
blu
e
(s
ig
+
)
bl
ac
k
(-
)
re
d
gr
ey
(s
ig
-)
blu
e
(s
ig
-)
br
ow
n
3
red
Fu
se
d
in
si
de
1A
bla
ck
7
w
hit
e
NB! Make sure to not use
any electronic interface
box (delay box) older than
the 6 1232i (ex. 6 122x)
on SP75Ti, SP95Ti, and
SP125Ti.
NB! Make sure to not use
any electronic interface
box (delay box) older than
the 6 1232i (ex. 6 122x)