Sleipner SE-IP60 Installation Manual Download Page 4

4

5897

14

2022

-

SE IP 60 s2

MC_0133

Thruster Measurements 

Measurement 

code

Measurement description

mm inch

ID

Internal tunnel diameter

185

7,28

H

Motor Height

321

12,64

W

Width

232

9,13

L

Length

272

10,71

WD

Water Depth

185

7,28

TL

Minimum tunnel length

128

5,04

TL (recommended)

Recommended tunnel length

165

6,50

T (min)

 Minimum tunnel wall thickness

4

0,16

T (max)

Maximum tunnel wall thickness

6

0,24

                  

* IP 60 s2

12v

*Valid for SE IP & SEP IP

MG_0311

H

W

L

TL

WD

ID

T

Tunnel centre line

Single Propeller

The gear leg/ propeller(s) must 

never extend out of the tunnel 

Propeller position will 

vary with each thruster 

model

Summary of Contents for SE-IP60

Page 1: ...EIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Ignition Protected DC Electric Thruster Models SE IP60 EN I M 5897 14 20...

Page 2: ...ng of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installation 13 Gear Leg Motor Bracket Installa...

Page 3: ...zed fuse and a battery isolation switch The installer must read this document to ensure necessary familiarity with the product before installation Instructions in this document cannot be guaranteed to...

Page 4: ...D Water Depth 185 7 28 TL Minimum tunnel length 128 5 04 TL recommended Recommended tunnel length 165 6 50 T min Minimum tunnel wall thickness 4 0 16 T max Maximum tunnel wall thickness 6 0 24 IP 60 s...

Page 5: ...evice protects against sudden change of drive direction The electric thermal cut off switch in electro motor protects against overheating auto reset when electro motor cools down Flexible coupling bet...

Page 6: ...deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during ope...

Page 7: ...of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby the...

Page 8: ...t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in...

Page 9: ...angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will...

Page 10: ...l and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled t...

Page 11: ...the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to th...

Page 12: ...l installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible roun...

Page 13: ...al in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For DC Electric Thrust...

Page 14: ...ly with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propel...

Page 15: ...the propeller until the drive pin aligns with the internal slot in the propeller 2 Insert the washer to the end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of...

Page 16: ...ts on the motors top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can b...

Page 17: ...i c duty cycle 2 Use appropriate sized cables and batteries with high cranking capacity to feed the thruster The actual voltage at the motor while running the thruster decides the motors output RPM an...

Page 18: ...0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0 2 x 3 0 100...

Page 19: ...Fuse Battery main switch 1 5 4 2 6 8 9 red grey sig blue sig black red grey sig blue sig brown 3 red Fused inside 1A black 7 white NB Make sure to not use any electronic interface box delay box older...

Page 20: ...the same time in opposite directions the electronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug play...

Page 21: ...egative 10A fuse With Automatic Main Switch With Manual Main Switch Visual Wiring Diagram IMPORTANT Check the following with the main switch in the off position After all electrical connections have b...

Page 22: ...on For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVI...

Page 23: ...house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tightened...

Page 24: ...f the defect to the best of the Claimant s knowledge including product identi cation and serial nbr the date and place of purchase and the name and address of the installer Proof of purchase date shou...

Page 25: ...25 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Page 26: ...26 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Page 27: ...27 5897 14 2022 SE IP 60 s2 MC_0037 Notes...

Page 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Reviews: