Manual_MSM_2021-10-013.00_EN.docx
29
8.7 SHUT DOWN
To switch off the instrument, use the main switch at the backside of the unit.
8.8 DOUBLE BASKET LOADING
[only applicable to instruments equipped with this feature]
In this case the instrument is equipped with two holders for micro slide transport
baskets on the lifting unit.
In the programming procedure, only one
basket is indicated, but two baskets are
loaded. In this case the preparation of the run
starts with loading of all baskets to the lifting
unit. The program will start to incubate the
first basket in position 1 and so forth. The
other basket will follow the procedure until it
has passed the last position.
Please note that the number of incubation
stations is reduced by two stations.
As each basket will be incubated in a different
beaker, all incubation times must be equal
when performing a double basket run.
Double basket loading in MSM 24. The
number of incubation stations should be
reduced by the last two incubation positions.