Installing Your Machine
Only qualified service personnel should install Slayer espresso machines. Incorrect
installation may result in injury and/or damage to the equipment. Please read the
"Important Safety Advisory" section on page 5 before beginning installation.
Install your Slayer espresso machine with the following ordered steps:
1.
Prepare Site
2.
Unpack Equipment
3.
Connect Drain Hose
4.
Connect Water Line
5.
Connect Machine to Power
6.
Fill Tanks
7.
Calibrate Brew Pump Pressure
8.
Turn On Heating Elements
9.
Set Time and Date
Step 1: Prepare Site
Your installation site will need direct access to power, water, and drainage. Building
regulations vary by region, so confirm local requirements prior to connecting your
machine.
Using quality, treated water is essential to achieving the best possible results when
preparing coffee and may also extend the life of your machine. Read “Water
Treatment Requirements” on page 6 for information about avoiding and addressing
water-related issues.
Your Slayer Single Group espresso machine weighs approximately 50 kilograms
(110 pounds) when filled with water and needs to be installed on a structure that is
capable of supporting its weight.
Use the following diagram to locate and drill holes in the counter for the water and
drain lines. Note that electrical plugs vary in size and a larger hole may be required
to accommodate the main power cord.
9