background image

EUTECTIC EC-10

OIL-FIRED WATER BOILERS/NO. 2 OIL

ASSEMBLY INSTRUCTIONS  

Tools required:

• 1 Phillips screwdriver
• 1 Wide flat screwdriver
• 1 13mm open end wrench
• 1 19mm open end wrench

©Slant/Fin Corp. 2014 • Printed in the U.S.A. 1214 • Part # 470901000 • Publication No. EC-10-50 Rev.B

Summary of Contents for EUTECTIC EC-10 Series

Page 1: ...LERS NO 2 OIL ASSEMBLY INSTRUCTIONS Tools required 1 Phillips screwdriver 1 Wide flat screwdriver 1 13mm open end wrench 1 19mm open end wrench Slant Fin Corp 2014 Printed in the U S A 1214 Part 47090...

Page 2: ...04000 470011200 Basic 470014000 SF 10 470299000 Contains the boiler instructions Contains the control panel instructions Packaging The following table shows the package numbers included with the boile...

Page 3: ...ront of the boiler casting sub assembly Take the body off the pallet and put it down vertically on the burner door Packagees 2 1 Installing the base Attach the base onto the front of the boiler Clip t...

Page 4: ...r door on the left side using the 2 screws Reverse the direction of opening of the burner door if necessary opening at left 2 6 2 6 Reinstall the hinge pins on the left side fixing them using the nuts...

Page 5: ...he boiler inside the base 1 2 8575N022 Installing the insulating material 3 2 1 Fix the insulation using the strap s and the attach ment strip Put the back insulation into place and fix it onto the pr...

Page 6: ...8 x 30 screw 2 flanged nuts Installing the control panel support cross bar Put the support cross bar into place on the boiler body positioning it on the M8 studs at the front the assembly rod and the...

Page 7: ...l panel support cross bar Shown with Honeywell aquastat control Attach cable clamp from bag of screw to cable to limit travel of cable through hole in control panel support cross bar Cable clamp will...

Page 8: ...under the fold of the cross bar Straighten the side panel and pull it upwards Attach the side panel to the lugs of the control panel support pulling its upper fold upwards such that the upper fold of...

Page 9: ...ng the front burner door panels Fix the two front burner door panels using four RLS M6 x 10 black screws delivered in the screw bag 2 2 1 1 8575N449A 12 8575N031D 2 2 1 Installing the cover Put the co...

Page 10: ...n position using the cable clamp and the 2 3 5 x 25 screws Slide the surplus cable back wards between the insulation and the side panel Secure cable clamp after slack is removed from cable to make sur...

Page 11: ...mbling the front cap Lift the window Attach the front cap in the openings near the bot tom of the side panels Slide the two lugs of the front cap into the notches of the side panels and then fix it in...

Page 12: ...near front as shown Place Installing Boiler Label near rear as shown 3 4 Place ETL label where shown 5 2 4 5 SLANT FIN CORPORATION Greenvale N Y 11548 www slantfin com Phone 516 484 2600 Fax 516 484...

Reviews: