background image

4

5

ASSEMBLY    

Part list

Key No. 

Qty. 

Description

Middle tube 1 with foam

Middle tube 2 with foam

Corner tube with foam

Curved tube with foam

5 1 

Backboard

6 2 

Ring

7 2 

Net

8 2 

String(1.2m)

Support block

10 6 

Screw

11 

4

 Bolt

12 4 

Washer

13  

Nut

14 2 

Basketball

15 3 

String(0.5m)

16                      1                                 Tools

1. Insert the Middle tube 1 with foam (1) into

Middle tube 2 with foam (2) as shown,

secure with a Screw(10).

2. Place the Backboard (5) on the ground, insert the assembled middle tube with foam into the top sleeve

as shown.

3. Insert the Corner tubes with foam (3) into the sleeve as shown, and secure on each side with two Screws 

(10). Be sure to connect the corner tube end with one hole to the middle tube, the end with two holes should 

be facing down.

1

3

3

4

5

7

9

6

4

2

1

10

1

2

.

3

two holes 

3

10

10

!

Reviews: