background image

SECTION 1, Page 5

SJKB Battery Powered

OPERATOR’S
CONTROL CONSOLE

BOOM
JIB

PLATFORM

RISER
ARM

BASE
CONTROL
PANEL

TURRET

TELESCOPING
BOOM
ASSEMBLY

DRIVE
CHASSIS

BATTERY
CHARGER

Figure 1-2B. SKYJACK SJKB Boom Work Platform

(Model SJKB-33C Shown)

Mawb100

WORK PLATFORM MAJOR COMPONENT IDENTIFICATION

SECTION 2, Page 10

SJKB Battery Powered

BATTERY SERVICE AND CHARGING
PROCEDURES

Battery Service

WARNING

EXPLOSION HAZARD

Keep flames and sparks away.  DO NOT smoke near
batteries.

CAUTION

Contact with electrolytic acid can cause skin irritation
and damage clothing.  Wear a protective apron, gloves
and goggles when working with batteries.

FIRST AID

Immediately flush eyes with cold water if electrolytic
acid is splattered into them.  Seek medical attention
if discomfort continues.

1.

Disconnect the batteries by separating the 350
Amp battery connectors.

WARNING

EXPLOSION HAZARD

DO NOT service the batteries without first separating
the 350 Amp battery connectors.  Vapors emitted by
batteries can be ignited by a spark or arc.

2.

Check battery fluid level in each battery.  If plates
are not covered, add distilled or demineralized
water.

3.

Check each battery case for damage.

4.

Clean battery terminals and cable ends
thoroughly with a terminal cleaning tool or wire
brush.

5.

Make sure all battery connections are tight.

6.

Replace any battery that is damaged or
incapable of holding a lasting charge.

7.

Reconnect the 350 Amp battery connectors.

Battery Charging Procedures

WARNING

EXPLOSION HAZARD

Chargers can ignite flammable materials and vapors.
DO NOT use near fuels, grain dust, solvents, or other
flammables.

WARNING

SHOCK HAZARD

To reduce the risk of electrical shock, connect charger
only to a properly grounded single phase outlet.  DO
NOT
 use a extension cord longer than 25 feet.

1.

Select “         ” (off) or “          ” (platform) position
with the Off/Platform/Base Key Select Switch.

NOTE

The battery charger WILL NOT operate if the Off/
Platform/Base Key Select Switch is in the “          ”
(base) position.

NOTE

When the battery charger is operating all machine
functions are disabled.

2.

Connect charger AC plug to proper voltage
source.  Refer to charger nameplate for voltage
requirements.

3.

Charge batteries.  DO NOT leave charger
unattended for more than two consecutive days.
Severe overcharging and battery damage will
result if charger fails to turn off.

4.

Disconnect charger from external power source.

Summary of Contents for SJKB-33i

Page 1: ...son Ave St Charles IL 60174 FAX 630 262 0006 For Parts in North America and Asia please call 800 965 4626 Skyjack Inc Parts Center 990 Vernon Rd Wathena KS 66090 FAX 888 782 4825 For Parts Service in...

Page 2: ...86psi 2 31 kg cm2 PIVOTAL HEIGHT 15 0 4 6m TAILSWING AT PIVOTAL HEIGHT ZERO TURRET ROTATION non continuous 365 degrees LIFE TIME minimum entry height to maximum platform height SJKB 33i 33C 95 seconds...

Page 3: ...S SJKB 33N 14 TABLE 2 6 TIRE SPECIFICATIONS SJKB 33i 33C 40i 40C 15 TABLE 2 7 STANDARD OPERATING TIMES SJKB 33N 33i 33C 40i 40C 15 TABLE 2 8 GENERAL SPECIFICATIONS SJKB 33i 33C 40i 40C 16 Page i TABLE...

Page 4: ...US INJURY THIS MACHINE IS NOT INSULATED MAINTAIN SAFE CLEARANCES FROM ELECTRICAL POWER LINES AND APPARATUS YOU MUST ALLOW FOR PLATFORM SWAY ROCK OR SAG THIS WORK PLATFORM DOES NOT PROVIDE PROTECTION F...

Page 5: ...o the possibility of personal injury or death Follow the instructions in the safety message SCOPE OF THIS MANUAL This manual applies to the ANSI SIA CSA and CE versions of the SJKB battery powered wor...

Page 6: ...ber for the return of any defective component s All items over 25 00 in value must be returned to Skyjack Inc WARRANTY STATEMENT 3 Fill out a Warranty Claim Form from dealer s supply of claim forms Th...

Page 7: ...ng valves to control vertical movement Manual lowering valves at the base of the riser boom and jib cylinders allow the mechanism to lower in the event of an emergency or electrical system failure TUR...

Page 8: ...hich have been altered or disabled SECTION 2 Page 13 SJKB Battery Powered Proper operation of the parking brakes should be checked daily or at the beginning of each shift Locate the machine in an appr...

Page 9: ...Released Parking Brakes ANSI and CSA Standards Compliance OPTIONAL EQUIPMENT Operator Horn All Function Motion Alarm Descent Alarm Travel Alarm Flashing Amber Light Spring Loaded Half Gate Spring Load...

Page 10: ...ve seconds later the CHARGER ON light will come on and at the same time the ammeter will indicate how much current is going to the batteries As the charge cycle continues which can last between 1 1 2...

Page 11: ...t covered add distilled or demineralized water 3 Check each battery case for damage 4 Clean battery terminals and cable ends thoroughly with a terminal cleaning tool or wire brush 5 Make sure all batt...

Page 12: ...the retract position Release the switch to stop 25 TO EXTEND THE BOOMARM Press and hold the Boom Extend Retract Toggle Switch to the extend position Release the switch to stop 2 Push in the Emergency...

Page 13: ...counter clockwise to decrease function speed or clockwise to increase function speed The Boom Speed Control will affect all lifting lowering and rotate functions but will not affect drive or steer sp...

Page 14: ...section push and hold this toggle switch to the down position Release switch to stop 4 JIB UP DOWN TOGGLE SWITCH This switch controls the up down movement of the jib To move the jib upward push and ho...

Page 15: ...H 7 PLATFORM LEVELING TOGGLE SWITCH 8 PLATFORM ROTATE TOGGLE SWITCH 9 BOOM SPEED CONTROL ROTARY SWITCH 10 DRIVE STEER CONTROLLER 11 HORN PUSH BUTTON 12 TILT SENSOR INDICATOR LIGHT 13 FUNCTION ENABLE L...

Page 16: ...eels being chocked 1 PARKING BRAKE RELEASE PLUNGER Located on the brake manifold in the hydraulic electric cabinet when this red plunger on the brake valve is depressed the brake valve opens allowing...