Section 3 - Operation
Guardrail Folding Procedure
WARNING
Ensure that you maintain three points of
contact when using the ladder to moun/
dismount platform.
WARNING
Operator must be at eye-level height
(at a minimum) to the mid-rail, with firm
footing, and have both hands free in order
to old down the guardrails from outside
of he aerial platform. It may be necessary
to use a stable elevated surface that
provides firm footing for the operator to
be at an appropriate height, with both
hands free.
10. Using a stable elevated surface that provides firm
footing, remove the locking pins from the entrance
side and fold down the rear gates.
Figure 3-13c. Rear Gate Folded Down
11. Remove locking pin from right side guardrail and
fold it down.
12. Remove locking pin from left side guardrail and
fold it down.
Figure 3-13d. Right Side & Left Side Guardrails Folded
Down
13. Fold down extension side guardrail and insert the
locking pin from outside inwards to lock guardrail
into place on the mounting post. Ensure that the
detent ball of the pin is all the way through.
Figure 3-13e. Guardrails Folded Down
SJIII 4740
Page 51
Summary of Contents for SJIII 4740
Page 1: ...198735AGA April 2018 DC ELECTRIC SCISSORS MODEL SJIII 4740 OPERATING MANUAL ANSI CSA...
Page 12: ...Page 12 SJIII 4740 Notes...
Page 34: ...FAMILIARIZATION FAMILIARIZATION Page 34 SJIII 4740 Notes...
Page 68: ...Page 68 SJIII 4740 Notes...
Page 77: ...SJIII 4740 Page 77 Notes...
Page 78: ...Page 78 SJIII 4740 Notes...
Page 93: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING...
Page 94: ...www skyjack com elig lift l sninger av folk som bryr seg...