144
SJ1044 TH, SJ1044 THS, SJ1056 TH, SJ1056 THS, SJ1256 THS
230790ABA
Section 5 – Procedures
250 Hour or Quarterly Routine Maintenance
5.4-12 E-chain and Hoses Inspection
1.
Fully retract the boom.
2.
3.
Find the servicing windows on the sides of the
boom and remove the covers.
Service
Window
4.
Examine the e-chain and hoses for damage or
wear.
5.
If maintenance is necessary, refer to section
5.6-
10 Cable Track Replacement on page 185
.
5.4-13 Grease Axle Pivot Bearings and King
Pins
Each axle has two integral pivot assemblies which
attach the axle to the frame. Each of the four pivot
assemblies requires independent lubrication.
Summary of Contents for SJ1044 TH
Page 4: ...4 SJ1044 TH SJ1044 THS SJ1056 TH SJ1056 THS SJ1256 THS 230790ABA Notes...
Page 10: ...10 SJ1044 TH SJ1044 THS SJ1056 TH SJ1056 THS SJ1256 THS 230790ABA Notes...
Page 25: ...25 SJ1044 TH SJ1044 THS SJ1056 TH SJ1056 THS SJ1256 THS 230790ABA Section 2 Maintenance Tables...
Page 105: ...105 SJ1044 TH SJ1044 THS SJ1056 TH SJ1056 THS SJ1256 THS 230790ABA Notes...
Page 205: ......
Page 206: ...www skyjack com...