DC Electric Full-size RTs
December 2007
Page 27
TM
Section 2 - Operation
Visual and Daily Maintenance Inspections
Platform
Assembly
Platform Control
Console
Platform
Railing
2.8-8 Platform Assembly
wARNiNG
Ensure that you maintain three points of
contact to mount/dismount platform.
1. Use the ladder of aerial platform to access
platform.
2. Close the gate.
Ensure there are no loose or missing
-
parts and there is no visible damage.
Ensure all fasteners are securely in
-
place.
Ensure all railings are properly positioned
-
and secured.
Ensure gate is in good working order.
-
Lanyard Attachment Anchors
•
Ensure attachment rings are secure and
-
no visible damage.
AC Outlet on Platform
•
Ensure outlet has no visible damage and
-
free from dirt or obstructions.
Platform Control Console
•
Ensure all switches and controller are
-
returned to neutral and are properly
secured.
Ensure there are no loose or missing
-
parts and there is no visible damage.
Powered Extension Control Console
•
(If Equipped)
Ensure all switches are returned to
-
neutral and are properly secured.
Ensure there are no loose or missing
-
parts and there is no visible damage.
wARNiNG
Ensure that you maintain three points of
contact to mount/dismount platform.
3. Use the ladder to dismount from platform.