
9
CALIBRATION AND SAMPLING
Calibration
Calibrate pump
fl
ow rate with the sampling head loaded with a media
cartridge in line.
See pump and calibrator operating instructions.
Allow the pump to equilibrate after moving it from one temperature extreme
to another.
Wear disposable, clean, lint-free nylon or powder-free surgical gloves to
handle the media cartridge.
Ensure pump has run for 5 minutes
before calibrating. Ensure rain
cover is removed from inlet and
that sampling head is completely
assembled with a media cartridge
(see Inserting a Media Cartridge
into the Sampling Head).
Thread calibration adapter into sampling head inlet.
Set and calibrate pump
fl
ow rate to 10 L/min (see Leland
Legacy Quick Guide). Record the pre-sample
fl
ow rate. See
pump and calibrator operating instructions.
1
When calibration is completed,
disconnect calibrator and tubing
from calibration adapter. Remove
calibration adapter from sampling
head.
Use provided short length of calibration tubing to connect inlet of calibration
adapter to outlet of a calibrator to form a calibration train.
Unscrew quick-connect plug on side of case. Use tubing with quick-connect
fi
tt
ing to a
tt
ach case (pump) inlet to exhaust of sampling head.
Ensure O-ring is installed on the quick-connect
fi
tt
ing before inserting it into
the inlet. Absence of the O-ring can a
ff
ect measurements. See Replacement Parts.
Inlet
Quick-
connect
plug
Inlet line
to pump
Quick-
connect
fi
tting on
tubing
Inlet to
pump
Calibration adapter
Calibrator
outlet
Sample
head
outlet