
6. Remove the power plug by holding the plug section instead of the cord to avoid electrical shock, leakage, or fire
accident.
7. Turn off the power whenever the machine is left unattended between works.
8. In case of a power failure or black out, turn off the power to avoid damage or accident.
1. Transportation
(1) When lift or move the machine, please take the machine weight into consideration and apply a safe manner.
Refer to the specification for the information you need for transportation.
(2) Apply sufficient safety measures when lifting or moving the machine to avoid falling or dropping.
(3) To avoid unexpected accident, do not reuse the packing material for transportation.
2. Unpacking
(1) Before proceeding to unpacking, check the balance of the machine and apply necessary tools to hold the proper
position.
(2) When unpacking, follow the instruction printed on the cartoon. Be careful of the nails and chips when unpacking
from a wooden rack.
3. Installation:
3A. Table and Stand
(1) Only adopt a qualified genuine table and stand to assure the holding support. In case you need to leave the
machine on a surface temporarily for service, make sure the surface is strong enough to hold the weight.
(2) If casters are applied to the table stand, adopt casters with a locking mechanism only and lock them well to
secure the machine during the operation and service.
3B. Cable and Wire
(1) The cables and wires must comply with the specification and requirement.
(2) The cables and wires shall be free from bending or extra force. Reserve a free space of at least 30mm between
cables/wires and the moving parts.
(3) Do not apply starburst connection when wiring.
(4) All connectors must be fixed securely. And always hold the connector body when removing it.
3C. Grounding
(1) Grounding is necessary and must be done by a certified technician. (2) Check and ensure the grounding is
secured before operation.
3D. Motor
(1) The motor must comply with the specification and requirement.
(2) If there is a belt in the motor transmission, adopt or apply a proper protector to avoid entangling.
4. Before Operation
(1) Before turning on the power, make sure all the connectors, cables, and wires are free from damage, dropout, or
looseness.
(2) Check and make sure the pulley rotation follows the same direction as labels.
PRECAUTIONS TO BE TAKEN IN VARIOUS OPERATION STAGES
Summary of Contents for ASK-ASM100
Page 1: ...ASK ASM100 ORIGINAL INSTRUCTIONS BOOK PARTS LIST...
Page 2: ......
Page 3: ...ENGLISH ENGLISH...
Page 16: ...3 Pulling Roller 1 Apply inner hex driver 2 5 to release screws P6...
Page 22: ...3 1 2 P12...
Page 25: ...i...
Page 27: ...1 1 2 3 4 2 1 2 3 4 3 1 2 3 4 1 2 3 5 1 2 3 4 6 7 8...
Page 28: ...1 1 2 3 2 1 2 3 3A 1 2 3B 1 2 30mm 3 4 3C 1 2 3D 1 2 4 1 2 3 4...
Page 29: ...5 1 2 3 4 5 6 6 1 2 3 7 1 2 3 4 5 6 7 8 8 1 2 10 3 4 5 C 35 C 35 85 5 6 7 8 9...
Page 30: ...ASM 1 2 OFF...
Page 31: ......
Page 32: ...1 2 4 5 7 11 13 15 16 25 26...
Page 34: ...747KST P 2...
Page 35: ...1 AC220V 10 0 5Mpa 5kg cm2 2 3 OFF 4 PE L1 L2 PE P 3...
Page 36: ...P 4 ON YES NO NO NO YES YES...
Page 37: ...1 2 2 5 P 5...
Page 38: ...3 1 2 5 P 6...
Page 43: ...1 1 AC 220V 10 2 0 5Mpa 5kg c 2 P 11...
Page 44: ...3 1 2 P 12...
Page 45: ...B Sensor Sensor Sensor A Sensor 14 18 Err 1 1 2 IGBT 3 Err 4 1 2 3 4 P 13...
Page 56: ...P 24 9 9...
Page 57: ...P 25...
Page 58: ...P 26...
Page 59: ......