5
If packaging shows signs of damage caused
during transport, the carrier must be informed
immediately; moreo-ver a detailed report on the
extent of the damage caused to the machine
must be notified to the carrier within three days
from the delivery date on the shipping
documents. If there are no
1.2 - CHECKING PACKAGING UPON DELIVERY
Heavyweight package. Do not manually lift without
the help of at least three people
(
Fig. n°5
).
To handle and move the package use suitable
manual or electric material handling equipment
fitted with suitable lifting accessories
(
Fig. n°6
).
Do not expose the package to humidity or rain
(
Fig. n°4
).
As the centre of gravity of the package is off-centre
do not to use lifting slings (Fig. 7)) to
ove the
package
(
Fig. n°7
).
Fig. n°4
Fig. n°6
Fig. n°5
Fig. n°8
Fig. n°7