3
0
Installation of indoor unit
hole.
1. Put the bound pipes in the wall pipe and then make them pass through the wall
2. Stuff the gap between pipes and wall hole with sealing gum.
3. Fix the wall pipe.
Note:
●
Do not bend the drain hose too
excessively in order to prevent
blocking.
Step eight: place the indoor unit
indoor
outdoor
wall pipe
sealing gum
2. Reserve a certain length of drain hose and power cord for installation when
binding them. When binding to a certain degree, separate the indoor power and
then separate the drain hose.
drain hose
band
connection pipe
indoor power cord
3. Wrap it evenly, and rolling width should be 1/3 of bandaging belt. Do not wrap it
4. The liquid pipe and gas pipe should be bound separately at the end.
too tight or too loose.
Note:
●
The power cord and control wire can't be crossed or winding.
●
The drain hose should be bound at the bottom.