![Sinclair ASH-18AIM2 PT Service Manual Download Page 40](http://html1.mh-extra.com/html/sinclair/ash-18aim2-pt/ash-18aim2-pt_service-manual_1280156040.webp)
36
Installation and Maintenance
Service Manual
●Discharging method
(1) remove the inverter cover(Outdoor Unit)
(2)As shown below,connect the discharge resistance(approx.100Ω20W)or plug of the sold ering iron to voltage b - terminals of
the electrolytic capacitor on PC Board for 30s, and then peformedischarging.
NOTE:
A large-capacity electrolytic capacitor is used in the outdoor unit controller(inverter).Therefore,if the power supply is turned
off,charge(charging voltage DC280V to 380V)remains and disc harging takes a lot of time.. After turning off the power source,if touching
the charging section before discharging, an electrical shock may be caused. Discharge the electrol ytic capacitor completely by using
soldering iron,etc.
P.C.board
(Soldered surface)
Inverter cover
Summary of Contents for ASH-18AIM2 PT
Page 1: ...SERVICE MANUAL ASH 18AIM2 PT ASH 24AIM2 PT MATRIX SERIE ...
Page 2: ......
Page 18: ...14 Technical Information Service Manual no display ...
Page 19: ...15 Technical Information Service Manual ...
Page 20: ...16 Technical Information Service Manual battery Cover of battery box remove reinstall ...