![Sinclair ASH-09AF Operational Manual Download Page 23](http://html.mh-extra.com/html/sinclair/ash-09af/ash-09af_operational-manual_1280131023.webp)
15
9.5
12
15~20
31~35
50~55
Tightening torque table
Hex nut
Tightening torque table
(N·m)
Ф6
Fig.7
☆
Electric wiring connection
1.
Take off handle on right side plate of outdoor unit (1 bolt).
2.
Take off clamp, then connect and fix the power connect wire to wiring terminal
board.Wiring allocation should be in accordance with that of indoor unit.
3.
Fix power connect wire by clamp, to cooling and heating unit, fix signal control wire too,
then connect the corresponding connector well.
4.
Ensure that the wiring is done well.
5.
Install handle (tightened by 1 bolt).
NOTE:
●
Wrong wiring connection will lead
to electric malfunction.
●
The lead between the joint and the fixed should
be a little free when fixing it with wire clamp.
Signal control wire
Only for cooling
Wire clamp
Blue Brown
Yellow-green
Joint
Spanner
Nut of connection pipe
Torque wrench
Handle
Install Part
and heating unit
Power connect wire
Summary of Contents for ASH-09AF
Page 31: ...30 ...