![Sinclair ASH-09AF Operational Manual Download Page 22](http://html.mh-extra.com/html/sinclair/ash-09af/ash-09af_operational-manual_1280131022.webp)
14
◆
Install of Outdoor Unit
Methods
①、②、③
are recommended piping ways.
☆
Install connection pipe
2.
After wrapped pipe and wire, pull them though the pipe hole (as shown in fig.5).
3.
Hang the mounting slot behind indoor unit on the pothook of the rear panel and move
it to check if it is firm enough (as shown in fig.6).
4.
Ensure the install height of indoor unit is 2m or higher.
①
Right pipe
②
Rear right pipe
(a)
④
Left pipe
③
Rear left pipe
(b)
(c)
Tailings
1
Tailings
2
Fig.4
Fig.5
Fig.6
Wrapping strap
Coonection pipe
Power connect wire
Signal control wire
1.
Aligh the flare of connection pipe to the joint flare of relative valve.
2.
Tighten the nuts on connection pipe forcibly then tighten ti by spanner as shown in fig.7.
Note: Too great of torque would damage nuts.
Drainage hose
Install Part
Summary of Contents for ASH-09AF
Page 31: ...30 ...