Page 23
MARIS ECDIS900 Installation Manual
C
ABLE RUN
Plan the installation and lay up the cables. Use existing cable ways and transitions as much
as possible. New transitions must be made in accordance with good workmanship and they
must be properly sealed (for fire protection).
Yes, accepted by class
No, rejected by class
From hall of fame
From hall of shame
All cables in the installation kit are screened cables. Do not forget to make a proper
grounding of the cables and the computers. The ToughCat network cable is perfect for
connecting the sensors and has 4 individually screened pairs.
The RJ45 network plugs supplied will ground the cable when fitted.
In addition to the mandatory sensors, lay-up the cables for other sensors. It is common practice
to connect AIS, ARPA X, Navtex, Echo sounder and Anemometer to the monitoring station
and other sensors to the planning stations. Because these sensors are not mandatory, the data
can be distributed over the network to all computers.
Summary of Contents for Maris ECDIS900
Page 1: ...ENGLISH Maris ECDIS900System Installation Manual www navico commercial com ...
Page 40: ...Page 40 MARIS ECDIS900 Installation Manual ECDISMK15 MECHANICAL DRAWINGS ...
Page 41: ...Page 41 MARIS ECDIS900 Installation Manual DIMENSIONAL DRAWINGS FOR 19 TERMINAL LAYOUT FOR 19 ...
Page 42: ...Page 42 MARIS ECDIS900 Installation Manual DIMENSIONAL DRAWINGS FOR 24 TERMINAL LAYOUT FOR 24 ...
Page 44: ...Page 44 MARIS ECDIS900 Installation Manual HATTELAND MONITORHD26T21 ECDIS900 PCMK5 ...
Page 63: ......