Simpson PT-22P Operator'S Manual Download Page 8

© 2013 Simpson Strong-T

ie Company Inc.

© 2013 Simpson Strong-T

ie Company Inc.

-13-

-14-

HOW TO LOAD AND FIRE THE PT-22P

1.  Open the tool. Grasp the nosepiece 

and pull sharply forward until you 
feel a positive stop, then pull the 
nosepiece back until it stops and is 
fully closed. This resets the piston.

2.  Insert the fastener into the 

nosepiece of the tool, head 
or threaded end irst. Push 
the fastener until the pointed 
end is even with the face of 
the nosepiece, or if a pre-
assembled fastener is used, 
until the nose piece is against 
the fastener accessory.

3.  Select the proper power level .22 

caliber “A” crimp load and insert 
it in the iring chamber. Note: the 
barrel must be slid back about 

½

"

 to allow the load to fully 

seat lush in the chamber. With 
the powder load fully seated, 
carefully slide the barrel closed.

Never place your hand over the nose of the tool unless inserting a fastener 
and then only with the chamber empty.

HOW TO LOAD AND FIRE THE PT-22P

WARNING: ALWAYS INSTALL THE FASTENER IN THE TOOL 

FIRST, AND CHAMBER THE POWDER LOAD LAST.

4.  Depress the tool irmly against the 

work surface using both hands, 
then pull the trigger. Make certain 
you hold the tool perpendicular 
to the work. Using the supplied 
rubber spall stop will help ensure 
the tool is perpendicular to 
the work surface and will help 
to minimize concrete spalling 
when the fastener is installed.

5.  After making the fastening, lift the 

tool off the work surface and pull 
the nosepiece sharply forward, 
or lip the tool open with a snap 
of the wrist. This action resets 
the piston and ejects the powder 
load shell from the chamber.

Summary of Contents for PT-22P

Page 1: ...DAMAGES SO THE ABOVE LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU SIMPSON IS IN NO WAY LIABLE FOR INCIDENTS RESULTING FROM USE WITHOUT PROPER CERTIFICATION OR DISREGARD OF INSTRUCTIONS AND WARNINGS TH...

Page 2: ...safe manner is YOUR RESPONSIBILITY 2 Simpson Strong Tie disclaims any responsibility for injury or death which may result from any disregard of this manual or the verbal instruction of the authorized...

Page 3: ...brace yourself when working on scaffolding or ladders MAKING SAFE FASTENINGS BASE MATERIAL SUITABILITY THE CENTER PUNCH TEST Before loading the tool or fastening into any material check the suitabili...

Page 4: ...the muzzle or point the tool toward any person when the tool is chambered with a load BEFORE CHAMBERING A POWDER LOAD PREPARE FOR LOADING 1 Always open the tool and inspect it to be certain it is unl...

Page 5: ...load it with fasteners and that it is clear of any obstruction 10 Any tool found not to be in proper working condition shall be immediately removed from service and tagged Defective Tool until it has...

Page 6: ...lug 7 PT22P 07 Breech Block 8 PT22P 08 Roll Pin 9 PT22P 09 Sear Pin Spring 10 PT22P 10 Sear Pin 11 PT22P 11 Breech Block Spring 12 PT22P 12 Breech Block Pin 13 PT22P 13 Firing Pin 14 PT22P 14 Firing P...

Page 7: ...urves when driven into concrete This is caused by the fastener hitting large hard or excessive amounts of aggregate rebar or any hard object Fish hooking can reduce the holding power of the fastener r...

Page 8: ...oad to fully seat lush in the chamber With the powder load fully seated carefully slide the barrel closed Never place your hand over the nose of the tool unless inserting a fastener and then only with...

Page 9: ...d inspection for any damaged parts Completely clean the tool and replace any damaged parts Reassemble the tool in reverse order of dismantling After reassembling the tool with no powder load or fasten...

Page 10: ...t misires the tool not iring PT 22P TROUBLESHOOTING TIPS PT 22P Tool Kit also includes Operators Manual Operators Exam P A T Warning Sign Spall Allen Wrenches Safety Glasses Ear Plugs Large Round Brus...

Reviews: