Citation - 52” & 61” Mower Decks
5
Roll Bar Assembly
Assemble Retainer Pins
1. Unpack the roll bar and hardware from the box.
2. Assemble the foam ring (
A, Figure 6
) onto the retainer
pin (
B
).
3. Loop the snap end of the lanyard (
C
) through the retainer
pin handle and snap together.
4. Install the lanyard anchor (
D
) onto the lanyard.
5. Install the clevis pin (
E
) onto the loop end of the lanyard
as shown in Figure 6.
Figure 6. Assemble the Retainer Pins
A. Foam Ring
B. Retainer Pin
C. Lanyard
D. Lanyard Anchor
E. Clevis
Pin
A
B
C
D
E
Figure 7. Assemble the Top Loop
A. Top Loop Tube
B. Plastic Cap
C. Rubber Stop
A
B
C
Assemble the Top Loop
1. Install the plastic cap (
B, Figure 7
) into the end of the
top loop tube (
A
). Repeat for other end of tube.
2. Make sure the rubber stop (
C
) is properly seated against
the inside of the pivot mount. See Figure 7.
Snap End
Loop End
Figure 8. Install the Upright Tubes
A. Upright Tube
B. Bumper
C. Frame
D. 1/2” x 3-1/2” Bolt GD.5
E. 1/2” Flat Washer
F. 1/2” Nylock Flange Nut (not shown)
Install the Roll Bar
1. See Figure 8. Remove and save the (2) 1/2-13 X 3-1/2”
bolt (
D, Figure 8
), 1/2” SAE washer, and 1/2-13 hex
nylock flange nut that secures the bumper to the frame
of the machine on one side of the machine. Discard the
1/2-13 hex jam nuts that are tightened on the threads of
the 1/2-13 X 3-1/2” bolts.
2. Install the upright tube (
A
) (refer to Figure 9 for correct
orientation) on the outside of the bumper (
B
) as shown
in Figure 8 and loosely reinstall the 1/2” hardware
previously removed.
3. Repeat steps 1 and 2 for the other side of the machine.
IMPORTANT: Make sure the upright tubes are angled
towards the front of the unit. See Figure 9.
A
B
C
E
D
Not
for
Reproduction