background image

KEY 
SYMBOL 

KEY DESCRIPTION 

 

 

LOOK 

 

 

THINK 

 

THIS SECTION  

RELATES TO ANOTHER 

(e.g. 1 to 5) 

 

 

CORRECT 

 

 

DO NOT FIX DOWN! 

 

 

TWIST TO LOCK 

 

 

TIGHTEN 

 

 

DO NOT WET! 

Thank you for purchasing your new Simplicity greenhouse. We recommend you familiarise yourself with the instructions and read all safety 
information before you commence assembly.  This instruction manual is also available online at 

www.greenhousepeople.co.uk

 in our technical 

help section should you need to reprint it.  Should you require any additional advice you can always call us on 01782 388811. 
 

These instructions are divided into sections; 

B

-base, 

partlists

,

1

-sides, 

2

-front gable, 

3

-rear, 

4

-joining the four sides together, 

5

-roof, 

6

-vent, 

7

-door,        

8

-glazing(

8a

 horticultural glass, 

8b

 toughened glass, 

8c

 polycarbonate glazing when available), 

9

-vent attachment, 

10

-door attachment, 

11

 anchoring 

down, 

back cover

-packing list.  If you need to contact us for assistance please refer to the relevant section/s. 

 

Safety Warning

 



Glass and aluminium can potentially cause injury. Please ensure you wear protective goggles, gloves, headgear and suitable footwear when 
assembling and glazing the building. 



Please remember that glass is fragile and should be handled with extreme care. Always clear up and dispose of any breakages immediately. 



Do not assemble the greenhouse in high winds. 



For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a minimum of two people.  



Please clear all lying snow from the greenhouse roof as it can cause the roof to buckle or collapse. 

 

Site Preparation

 



When selecting a site for your greenhouse, it is vital that you choose as flat and level an area as possible.  



A concrete or slabbed base will provide the most solid foundation for your greenhouse.   



IMPORTANT: Do 

not

 fix your building down until the building is fully assembled, including glazing.   



Avoid placing your greenhouse under trees or in other vulnerable locations. 



To minimise the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedgerow or garden fence. 

 

Additional Considerations

 



Please bear in mind that assembling your greenhouse can be time consuming. You may need to spread the construction over two or more 
days. We recommend that you avoid leaving the building partially glazed.  If you ever have to leave your greenhouse half assembled and not 
anchored down, weigh it down with slabs or bags of sand to stop the wind moving it. 



You will find it helpful to prepare a large, clean and clear area in which to work in. A garage floor or flat lawn area is ideal. 



If you have arranged for someone to install your greenhouse for you, please check that all components are included. Most parts are numbered 
and can be identified by a stamp or removable label. Alternatively, the components can be identified by lengths detailed in the packing list (see 
diagram below). 



Anchoring down your greenhouse should be the final stage of construction (including glazing).  



Once installed your greenhouse requires little maintenance, but to maintain the smooth running of your door(s) WD40 or similar can be applied 
to the door wheels and lower door guides.  

 

Guarantee

 



Your new Simplicity greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include glazing, moving 
parts, accidental damage or wind damage. 

610mm 

121 

Summary of Contents for 7 HE Series

Page 1: ...0 2233 R A N G E Please be aware that the door currently opens to the left not the right Please note that this is a brand new instruction manual If you find any mistakes or you think anything needs im...

Page 2: ...ng a site for your greenhouse it is vital that you choose as flat and level an area as possible A concrete or slabbed base will provide the most solid foundation for your greenhouse IMPORTANT Do not f...

Page 3: ...A mm B mm 7 4 x 4 3 1295 7 4 x 6 3 1910 7 4 x 8 3 2530 7 4 x 10 4 3150 7 4 x 12 4 3770 2233 OPTION 1 base on grass OPTION 2 base on slabs OPTION 3 base on concrete OPTION 4 no base on brick...

Page 4: ...14 2480 2 27 1860 2 58 1240 2 21 1585 2 47 1504 2 4 6 8 10 4 M4 M6 121 612 1 1 2 2 2 123 612 1 1 2 2 2 124 610 2 2 4 4 4 1 1 2 2 2 2 2 4 4 4 6 6 12 12 12 2 2 4 4 4 2 3720 1 6 3100 1 12 2480 1 26 1860...

Page 5: ...6 7 8 7 10 7 12 Page Ref 7 HE 10mm 1 79 168 1 41 1763 2 95 614 1 130 619 4 137 883 2 2 2 2 4000 1 126 162 198 234 270 92 112 130 148 166 5 roll 6 roll 6 roll 7 roll 8 roll 103 116 126 138 148 104 116...

Page 6: ...04 8 5 3100 2 21 1586 4 M6 20 M6 20 Part No mm Quantity 14 2480 2 47 1504 6 17 2480 2 21 1586 4 M6 16 M6 16 Part No mm Quantity 27 1860 2 47 1504 4 25 1860 2 21 1586 4 M6 12 M6 12 Part No mm Quantity...

Page 7: ...21 47 47...

Page 8: ...tity 43 1730 1 76 1504 1 77 1504 1 240 2174 1 243 2050 1 42 1730 1 Part No mm Quantity 244 2050 1 245 1296 1 246 1296 1 249 773 2 285 1647 2 36 36 M6 2 1 240 243 244 285 76 77 249 245 246 249 285 42 4...

Page 9: ...240 285 244 245 245 246 240 76 77 245 246 285 249 76 77 243 244...

Page 10: ...ntity 42 1730 1 43 1730 1 76 1504 1 77 1504 1 241 2174 1 242 2154 1 Part No mm Quantity 243 2050 1 244 2050 1 245 1296 1 246 1296 1 285 1647 2 34 34 M6 2 1 242 285 43 44 241 243 244 285 76 77 245 246...

Page 11: ...243 244 245 246 241 76 77 241 285 243 244 245 246 245 246 76 77 285 242...

Page 12: ...This bar is currently riveted to the door track assembly 54 Please ignore at this stage Part 54 fitted in section 10...

Page 13: ...Drill centrally between two vertical glazing bars for neatness it is not essential to drill every section Make sure the bolt head does NOT interfere with the line of the glass Cills should be drilled...

Page 14: ...0 1 247 1305 6 248 1390 4 93 636 2 139 600 608 1 20 6 Part No mm Quantity 26 1860 1 247 1305 4 248 1390 4 93 636 1 14 4 Part No mm Quantity 57 1240 1 247 1305 2 248 1390 2 85 628 1 1 2 1 2 3 4 4 247 3...

Page 15: ...12 Part No mm Quantity 2 3720 1 247 1305 10 248 1390 4 93 636 2 139 600 608 3 34 10 Part No mm Quantity 6 3100 1 247 1305 8 248 1390 4 93 636 2 139 600 608 2 28 X 2 M4 X 4 139 600 85 93 600...

Page 16: ...124 121 121 124 610 x 610 M6 10mm X 2 X 2 X 4 M4 X 2 M4 X 2 X 4 X 1 1220mm Part No mm Quantity 121 612 1 123 612 1 124 610 2...

Page 17: ...123 610 x 610...

Page 18: ...Part No mm Quantity 41 1763 2 95 614 1 130 619 4 137 883 2 95 130 130 130 137 137 41 41 M6 x 10 16 16 M6 X 2 X 2 X 2 X 1 4 m 7 2 m FLUFF FLUFF FLUFF...

Page 19: ...41 41 41 Please note that you may need to change the orientation of the diagonal flat bar braces in your door s to make fitting your door stop easier i e the diagonals can be fitted in either orienta...

Page 20: ......

Page 21: ...A H U Size mm 4 6 8 10 12 S 610 X 1500 5 7 9 11 13 R 610 X 1322 3 5 6 8 10 U 610 X 719 1 1 2 2 2 A 610 X 610 3 3 4 4 4 D 610 X 277 F 457 X 190 4 B 305 X 1197 4 G 457 X 1197 4 H 610 X 363 1 610mm 12 1...

Page 22: ...610 X 457 16 20 24 28 32 H 610 X 363 1 P 457 X 276 4 G 610 X 305 4 D 457 X 305 8 E 610 X 589 1 F 610 X 120 4 6 8 10 12 K 610 x 153 1 L 573 x 100 5 K L A H V A A A B B B B G D X D P P 32 X 246 305 457...

Page 23: ...10 X 1322 3 5 6 8 10 A 610 X 610 3 3 4 4 4 U 610 X 719 1 1 2 2 2 H 610 X 363 1 R S S S S A A U M Q O L 573 x 100 5 A A H U N P C P N P O 610 457 305 2265 2055 2046 1736 1729 1529 610 447 N 457 2046 17...

Page 24: ...123 85 93 85 93 85 93 85 93...

Page 25: ...ner bar and attach with a nut and bolt being careful to avoid any glass 54 240 54 1275 1 Carefully remove 2 nuts from door rear and attach door stop handle see diagram Re attach the nuts Attach upper...

Page 26: ...SAND O7mm No 10 x 2 Please note you will have to drill and screw through your metal base and into your solid foundation at an angle from outside the building...

Page 27: ...o get into our next brochure we will send you a 25 reward Please send your photos to Photo competition Simplicity Greenhouses Blythe Park Cresswell Stoke on Trent Staffs ST11 9RD 01782 388811 Or bette...

Page 28: ...PART CAN BE 139 OR 600 1 2 3 1 1 2 2 2 5 6 6 7 8 4m 4m 4m 4m 4m 1 smalls pack for correct size of building BOX PACKED BY 285 1647 4 4 4 4 4 No mm 4 6 8 10 12 1 3720 2 2 3720 1 3 3720 2 5 3100 2 6 3100...

Reviews: