Page 10
Commissioning
Connect the PE cable to the PE-connection on
the lid.
Figure 14: PE-connection
Place the cover and fasten it with the two
screws on the side.
Figure 15:
Close the housing
5.3 Troubleshooting
ATTENTION
After connecting the battery pack, the RESET but-
ton must be pressed for
5 seconds
to initialize the
SHEV!
PE-connection
Fixing screws
ATTENTION
Due to the low loop current, the insulation resistance
of the monitored wires (B1, B2 and B3) must be
checked!
The insulation resistance must be
>
20
M
Ω
/ km
(manufacturer information), otherwise wire
interruptions will no longer be detected reliably .
INFORMATION
The operating states of SHEV
3 / 6 (-AP)
can
option-
ally be visualized with SIMON-LINK (only during
mains operation).
For more information visit