42
EN
3.5.2
Support base for boiler & collector assembly
Open the preassembled beams Unit
A and Unit B.
Unit A
Unit B
Assemble collectors beam (1a) and
(2b). Screw diagonal part (3) to the
beam of collector(1a), using the
screw M8x60. Place the screw rod
M8 (7), screw it, using the washer
and the nut M8 both of sides of ver-
tical (2) and diagonal beam (3).
1a
1b
2
3
7
Repeat the steps above for the rest
beams.
Place parts (5) crosswise and tight
en the screws.
5
Place collector support 4 on top
of the beam 1b . Fix it with bolts
M8x16 (A).
Place second collector support and
mount it on beam 1a (B).
1a
4
1b
4
A
B