2.4 Multi-Bar Installations
For multi-bar installations power is distributed via the RJ-11
connector with 6-conductor modular cable and bars must be
chained together via this connection. Note that in this configuration
adequate current must be available for multiple bars, and the
maximum rating on the DC power supply should not be exceeded.
Bar address numbers should not be duplicated on a given chain.
Having more than one bar “0” will cause communication conflict on
the chain. Address “0” designates the bar as the master and other
bars (if designated as slave) attached to the chain will pulse
synchronously with the master. Where the user supplies
appropriate power to the system, up to 9 bars may be connected to
the master.
In cases where a combination of steady state and pulse coverage
is required with multiple bars, a bar or bars within the system can be
set to the independent class.
Summary of Contents for scorpION3
Page 1: ...I O N I Z A T I O N S O L U T I O N S Ionizing Bar System scorpION3TM User s Manual...
Page 6: ...scorpION3 5200969 Rev 4 1 1 Description 1 1 scorpION3 Ionizing Bar System 1 2 Features...
Page 29: ...scorpION3 5200969 Rev 4 24...
Page 30: ...scorpION3 5200969 Rev 4 25 3 Operation 3 1 Settings...
Page 41: ...scorpION3 5200969 Rev 4 36...
Page 42: ...scorpION3 5200969 Rev 4 37 5 Specifications 5 1 Specifications 5 2 Parts Accessories...
Page 49: ...scorpION3 5200969 Rev 4 44...