STEP THREE: FINISH INFLATION
After inflating the tubes, insert the barometer against the valve. Check if the pressure in the air chambers
reaches 0.25 bars, then remove the barometer and screw the cap on.
Note: Gently press down around the air deck floor edges to ensure a snug fit under the buoyancy
chambers. Then inflate the chambers to working pressure.
IMPORTANT: Only inflate the keel to 80% of maximum pressure, since it reaches a critical pressure
very quickly. Please note that inflating the keel to 100% pressure will hurt the performance of the boat
under power and bend air deck.
STEP FOUR: OAR ASSEMBLY
1. Press the clasp at one end of the oar, and insert it into blade end.
3. Screw the cap back to lock
the oar into position.
4. Secure the blade end in
its clasp.
4. Seat bag assembly
After the Seat Assembly, attach the bench seat bag onto the bench seat.
2. Press the screw on the oar-
lock through the hole on the oar.
7