Operation
37
users manual inverter SE2.8i - SE3.8i - SE4i - SE5i
During the System Check, if the DC input voltage is not reaching the point of the PV start voltage setting, , then the following message will
be shown on the LCD and the system will stay at this step.
During the System Check, if the grid is not connected to the inverter, then the inverter enters to Fault mode and following message will be
shown on the LCD.
Monitoring Mode :
Once the System Check is done, the inverter goes into the Monitoring mode. If all data needed for grid feeding is in the acceptable range,
the system will keep monitoring those data for a period of time. The following information tells users that the system will go into the Grid/MPP
mode in XXX seconds late and then show the measured data of the DC input voltages and the existing voltage and frequency on the grid side.
L o w
I n s o l a t i o n
M o d
F a
e
u l t
G r i d N A
M o d
o r
e
i n g
N e x t C o
t
i
n
o
M
n n e c t
X X X s
Summary of Contents for se2.8i
Page 1: ...nverters...
Page 12: ...11 1 pc 1 pc...
Page 18: ...on 17 OFF Fig 2 3 3 Remove the cover of the wiring box...
Page 29: ...Fig 2 3 3 4 RS 485 connection Installation user s manual inverter SE2 8i SE3 8i SE4i SE5i...
Page 54: ...53...
Page 64: ...63 E5i S...
Page 72: ...71 4 2 1 1 Remove the cover of the Inverter 5 4 2 1 2 Remove the DC and AC wires...
Page 76: ...75 tall the cover plate and fix it on the top of the wiring box...
Page 81: ...Notes user s manual inverter SE2 8i SE3 8i SE4i SE5i...
Page 82: ......