![Silicon Laboratories Si5397 Series User Manual Download Page 14](http://html1.mh-extra.com/html/silicon-laboratories/si5397-series/si5397-series_user-manual_1271744014.webp)
10.4 Common ClockBuilderPro Workflow Scenarios
There are three common workflow scenarios when using CBPro and the Si5397-A-EVB. These workflow scenarios are:
• Workflow Scenario 1: Testing a Silicon Labs-Created Default Configuration
• Workflow Scenario 2: Modifying the Default Silicon Labs-Created Device Configuration
• Workflow Scenario 3: Testing a User-Created Device Configuration
Each workflow scenario is described in more detail in the following sections.
10.5 Workflow Scenario 1: Testing a Silicon Labs Default Configuration
The flow for using the EVB GUI to initialize and control a device on the EVB is as follows:
Once the PC and EVB are connected, launch
ClockBuilderPro
by clicking this icon on your PC’s desktop:
Figure 10.5. ClockBuilderPro Desktop Icon
If an EVB is detected, click on the “Open Default Plan” button on the Wizard’s main menu. CBPro automatically detects the EVB and
device type.
Figure 10.6. Open Default Plan
UG353: Si5397 Evaluation Board User's Guide
Using the Si5397-EVB
silabs.com
| Building a more connected world.
Rev. 0.1 | 14