Figure 6.9. CBPro—Write Progress Window
After CBPro writes the default plan to the EVB, click on “
Open EVB GUI
” as shown in the figure below.
Figure 6.10. CBPro—Open EVB GUI Button
The EVB GUI window will appear on the desktop. Note all power supplies on the “
Regulators
” tab will be set to the values defined in
the device’s default CBPro project, as shown in the figure below.
Figure 6.11. EVB GUI—Regulators
Si5381/82 Evaluation Board User's Guide
Using the Si5381/82A-E-EVB and Installing ClockBuilderPro (CBPro) Desktop Software
silabs.com
| Building a more connected world.
Rev. 1.1 | 12