
007-5717-002
13
Chapter 2
2.
Pre-Installation Guidelines
To ensure safe and efficient operation of your server, proper planning is essential. Factors such as
the proper location of the server in its rack, adequate power to the components in the rack, and the
appropriate operating environment for the rack. The guidelines described in this chapter are
categorized as follows:
•
“Server and Rack Positioning” on page 13
•
“Electrical Power” on page 14
•
“Operating Environment” on page 14
•
“Rack Stability” on page 15
•
“Cables” on page 15
•
“Security” on page 15
Server and Rack Positioning
Follow these guidelines to ensure that the server is safely and appropriately positioned for efficient
operation and service.
•
When determining the location for the server, position it so that there is adequate space for
airflow and servicing.
•
When positioning the server in a rack, be sure to allow adequate space for airflow and
servicing from the front and the rear.
•
Clearance in the front of the server should be a minimum of 36” to allow the chassis to easily
slide in and out of the rack.
•
Clearance in the rear should be approximately 30” to allow for sufficient space for airflow
and ease of servicing.
•
Do not cover the front or rear of the server or any of the openings on the server front and rear
panels.