Chapter 2
2.
System Operation
This chapter describes the basic steps needed to get your SGI Rackable C1110-RP6 system up and
running. Following these steps in the order given should enable you to have the system operational
within a minimum amount of time.
Unpacking the System and Choosing an Operating Location
You should inspect the box the system was shipped in and note if it was damaged in any way. If
the server itself shows damage you should file a damage claim with the carrier who delivered it.
When you decide on a suitable location for the rack unit that will hold the system, it should be
situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise
and electromagnetic fields are generated. You will also need it placed near a grounded power
outlet. Be sure to read the Rack and Server Precautions in the next section.
Preparing for Setup
The box the system was shipped in should include two sets of rail assemblies, two rail mounting
brackets and the mounting screws you will need to install the system into the rack. Follow the steps
in the order given to complete the installation process in a minimum amount of time. Please read
this section in its entirety before you begin the installation procedure outlined in the sections that
follow.
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely;
approximately 25 inches (63.5 cm) should be sufficient.
Leave approximately 30 inches (76.2 cm) of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
Summary of Contents for Rackable C1110-RP6
Page 1: ...SGI Rackable C1110 RP6 System User Guide 007 5843 002 ...
Page 4: ......
Page 12: ......
Page 34: ......
Page 51: ...Power Supply 007 5843 002 39 Figure 4 10 Removing the 450 Watt Non Redundant Power Supply ...
Page 58: ......