Installation
VTY
- 18 -
© SIKA • Ea7900_VTY • 05/2022
IMPORTANT NOTICES
• Only use suitable gaskets during mounting.
• Observe the flow direction indicated on the device.
• Observe the mounting dimensions (
p. 24).
Select an appropriate location for installation (
p. 16).
To ensure the best possible measuring accuracy, a verti-
cal installation position with increasing flow is preferable
(no collecting of dirt deposits).
Install the appropriate screwed connections at the installa-
tion location.
Insert the flow sensor together with the gaskets.
Pay attention to the correct position of the gaskets!
Screw the union nuts of the screwed connection onto the
process connections of the flow sensor.
PAY ATTENTION TO MAXIMUM
TORQUE
While tightening, counter the union nut on the tur-
bine body of the process connection!
If you do not counter it, the flow sensor can be
damaged.
Maximum torque / Width across flats
VTY10MA
• G½
VTY10K5 •
G¾
VTY15 •
G¾
VTY20 •
G1
VTY25 •
G1¼
20 Nm
8 Nm
20 Nm
20 Nm
20 Nm
AF19
AF19
AF24
AF30
AF36
Tighten both union nuts.
When tightening, use a spanner to counter the process
connection on the turbine body in place.
Summary of Contents for VTY10K5
Page 26: ...VTY 26 SIKA Ea7900_VTY 05 2022...