Instruction Manual AquaMaster
Servicing
70
12745E/4
8.1.3
Installing sensors
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Insert sensor in the desired measuring position
on the measuring cell block.
The position of the sensors is generally
irrelevant. However, because of escaping
electrolyte it is better to position the pH and
Redox/ORP sensors to the right of the Con-
ductivity sensor.
2.
Press sensor into the measuring cell block. The
holder must be flush with the measuring cell
block.
3.
Close the measuring cell block with the locking
device.
4.
Fold up measuring cell block cover.
If the locking device has not been
pushed onto the measuring cell block or not
been properly pushed, the measuring cell
block cover cannot be closed.
5.
Put system into operation in accordance with
Section 5.