
P10
Tel:+86-755-27608650 Fax:+86-755-27608651 [email protected]
Yijia Industrial Park, Fuqian Road, Guanlan Town, Baoan, Shenzhen, Guangdong, China
www.signcomplex.com
Signcomplex
We bring innovation and give inspiration
100W
-
200W
90mm
1. Ceiling installation
2. Wall mounted installation
3. Pedestal installation
1. Ceiling installation
2. Wall mounted installation
3. Pedestal installation
1. Bore holes on the installation surface according to
installation hole position on the bracket to install
2-
3
pcs
M10
expansion bolts.
2. Install at washers, spring washers and nuts to x and
tight the bracket and expansion bolts to ensure the light
is installed reliably.
3. If it is necessary to adjust irradiation angle of the light,
rst to loosen the xing bolts of the brackets one to two circles
(not loosen too much). After proper adjustment of the angle,
tighten the xing bolts.
4. Connect the power cord of the light with commercial
power. Waterproof sealing for the joint should be carried properly.
1. bore holes on the installation surface according to
installation hole position on the main bracket to install
2-3pcs
M10/M12 expansion bolts.
2. Install at washers, spring washers and nuts to x
and tight the min bracket and expansion bolts to ensure the
light is installed reliably.
3. If it is necessary to adjust irradiation angle of the light,
loosen the xing bolts of the auxiliary bracket o the main bracket
1-2 circles (not loosen too much).
After proper adjustment of the angle, tighten the xing bolts of
the main bracket and auxiliary bracket.
4. Connect the power cord of the light with commercial
power. Waterproof sealing for the joint should be carried properly.
Slotted hole
2-50*11mm
φ
11
m
m
100mm
Slotted hole
2-55*13mm
φ
13
m
m
240W
-
300W
U Trunnion bracket
Wiring diagram:
black
white
red
Area lights
Normal series an Photocell Series:
AC100
-
277V
green
DC+
blue
DC-