6.2
Start
‒
Ensure that the analyser is resting on a stable surface or fixed into a rack, or on a wall if
the wall-mount option has been chosen;
‒
Connect the included (or equivalent) power cable to the rear panel IEC power socket,
ensuring the supply voltage is within the operational limits of the instrument;
Figure 1: NEBULA rear panel
‒
Ensure that the correct fuses are in place within the integrated IEC socket on the rear panel.
‒
Figure 2 below shows the rear panel layout of the NEBULA;
Figure 2: NEBULA pneumatic connections
1
/
4
” SAMPLE
INLET
1
/
8
ʺ
SPAN
INLET
1
/
8
ʺ
ZERO
INLET