For wall assembly the C22 Vibration Monitor should be mounted
on its backside. For ground assembly the C22 Vibration Monitor
should be mounted on its bottom side.
3.
Close the flame proof enclosure with all M8x30 bolts and
remember to renew the grease for a totally sealed box.
4.
Mount the unit in the desired position. As stiff mounting as
possible is recommended.
For the system to work properly GSM connection is needed at the mounting
location. Otherwise data will not be uploaded to the web service.
Figure 1: The C22 position inside a ground mounted ATEX box