![Sierra Series 200 Owner'S Manual Download Page 5](http://html.mh-extra.com/html/sierra/series-200/series-200_owners-manual_1266381005.webp)
5
System Installation Checklist
Basic Checklist
Summary
This is a reminder of the basic steps to get your control system configured and running.
Hardware installation and external connections
Configure all necessary jumpers on each board.
Plug boards into the backplane in the correct slots.
Connect the control system to an external 12 VDC power source.
Connect the CPU’s DB-9 connector to your PC.
Connect each RCB’s DB-9 connector to your external devices: radios (repeater, RF
links, remote base radios), VOIP computers, etc.
Software configuration
Set basic configuration parameters
Call sign
Site prefix
Location ID
Unlock code
Set radio port configuration
Set audio levels
Customize commands
Save the configuration to a file
Download configuration to the control system
Summary of Contents for Series 200
Page 1: ...Sierra Radio Systems Series 200 Control System Owners Manual Version 1 2 ...
Page 22: ...22 Radio I O II RIO II Board ...
Page 23: ...23 Configuring the Control System ...
Page 39: ...39 Installing New Firmware ...
Page 48: ...48 Control System Operation ...
Page 53: ...53 Control System Command Reference Guide ...
Page 105: ...105 Methodology for System wide Audio Level Setting ...
Page 109: ...109 ...
Page 110: ...110 ...
Page 111: ...111 Appendix ...
Page 121: ...121 ...