IOM-007
Installation Operation Manual for TC3A-107 and Similar EDUs
Page 11 of 19
Figure 5. Mounting bracket assembly
5. Secure the mounting brackets to the structure via the previously drilled interface holes
identified in step 1. Install with the 4 x M8*40 screws and 4 x M8 washers provided
Note: Fit the earth straps under the required mounting screws and torque to 10Nm
. See Fig 6
Figure 6. ISO view of box indicating mounting screw positions for reference.
6. Route and fit CP connecting earth strap to structure via the previously drilled interface holes
detailed in step 2 and secure with 2 off item SC-M8*20 cap head screws fitted with the
supplied M8 washers torque to 10Nm.
M8 screws for fixing to
structure
M6 Screws for fixing
bracket to body.
(ALLOY 625 so no CP
required for these)
Anti-rotation peg.
Install 4 off M8
mounting screws.