Parameterizing the SITOP UPS1600
6.2 Switching off the UPS by a user program when the power fails
SITOP UPS1600 under STEP 7 V5
30
Getting Started,
Preconditions
The following preconditions must be fulfilled in order to be able to use function block FB160:
●
The library with the function block has been downloaded to the PC.
●
The generic station description (GSD) for the UPS1600 has been installed in STEP 7 V5.
●
The UPS1600 has been set up for buffer operation (see Chapter Buffering an S7 IO
controller, including the I/O when the power fails (Page 21)).
Loading the block library into STEP 7 V5
1.
Open the project into which the FB160 function block should be inserted.
2.
Select the menu command "File > Open...".
Dialog box "Open Project" is opened.