Technical Data
4.22 Additional Functions
SIPROTEC, 7SK80, Manual
E50417-G1140-C344-A5, Release date 11.2012
412
Commissioning Aids
Clock
Group Switchover of the Function Parameters
IEC 61850 GOOSE (Inter-Relay Communication)
- Phase rotation test
- Operational measured values
- Circuit breaker test by means of control function
- Creation of a test fault report
- Creation of messages
Time synchronization
Binary input
Communication
Modes of operation for time tracking
No.
Mode of operation
Explanations
1
Internal
Internal synchronization using RTC (presetting)
2
IEC 60870-5-103
External synchronization using port B (IEC 60870-5-103)
3
Pulse via binary input
External synchronization with pulse via binary input
4
Fieldbus (DNP (serial or DNP3 TCIP,
Modbus, IEC 60870-5-103 redundant)
External synchronization using field bus
5
SNTP (IEC 61850, DNP3 TCP,
PROFINET IO)
External synchronization using port B (IEC 61850)
-
SNTP (no IEC61850)
External synchronization via port A
Parameterization via device; notes under 2.1.2.2
Number of available setting groups
4 (parameter group A, B, C and D)
Switchover can be performed via
the keypad on the device
DIGSI using the operator interface
protocol using port B
binary input
The GOOSE communication service of IEC 61850 is qualified for switchgear interlocking. Since the transmis-
sion time of GOOSE messages depends on both the number of IEC 61850 clients and the relay's pickup con-
dition, GOOSE is not generally qualified for protection-relevant applications. The protective application is to
be checked with regard to the required transmission time and cleared with the manufacturer.
Summary of Contents for SIPROTEC 7SK80
Page 8: ...Preface SIPROTEC 7SK80 Manual E50417 G1140 C344 A5 Release date 11 2012 8 ...
Page 496: ...Literature SIPROTEC 7SK80 Manual E50417 G1140 C344 A5 Release date 11 2012 496 ...
Page 508: ...Glossary SIPROTEC 7SK80 Manual E50417 G1140 C344 A5 Release date 11 2012 508 ...
Page 512: ...Index SIPROTEC 7SK80 Manual E50417 G1140 C344 A5 Release date 11 2012 512 ...