![Siemens Sinorix al-deco STD Operating Handbook Download Page 26](http://html.mh-extra.com/html/siemens/sinorix-al-deco-std/sinorix-al-deco-std_operating-handbook_383270026.webp)
Technical data
26
Building Technologies
A54475-A1-A2_EN_05.docx
Fire Safety
01.2018
Interface connections
A
For storage and transport, the red plug-in bridge (BR1) is fitted to just one pin. This
protect the battery from being unnecessary discharged. After commissioning, the red
plug-in bridges (BR1) must be fitted to both pins so that the battery will go into
operation.
B
The power supply to the communication interface is switched on and off with the slider
switch.
Switch right =
switched on
Switch left
=
switched off
C
USB plug for the read-out of the system data.
D
Battery for bridging over losses of the mains supply for up to 12 hours. (Refer to the
Maintenance and Repair Instructions for the replacement of the battery
)
E
Rating plate with all the information required by the regulations
The terminal configuration can be seen from connection diagram on the following page.
C
B
A
D
E
C
Summary of Contents for Sinorix al-deco STD
Page 31: ......